Files
sure/test/interfaces/syncable_interface_test.rb
ghost 94d2ee908d fix(jobs): enqueue jobs after transaction commit to fix SyncJob deserialization race (#2354)
* fix(jobs): enqueue jobs after transaction commit to fix SyncJob deserialization race

Syncable#sync_later creates a Sync row and enqueues SyncJob inside the
same transaction. Rails 7.2 deferred such enqueues until commit by
default; Rails 8.0 changed the default to enqueue immediately and 8.1
left the global config toggle non-functional, so a worker could dequeue
the job before COMMIT, fail to resolve the Sync GlobalID
(ActiveJob::DeserializationError), and have it silently dropped by
discard_on -- surfacing as stuck syncs after the Rails 8.1 upgrade.

Set enqueue_after_transaction_commit = true on ApplicationJob (the
Rails 8.2 default, inherited by every job) and drop the dead :never
symbol override on DestroyJob. Add regression and invariant tests.

* test(jobs): use OpenStruct for DestroyJob failure case

Replace the bare mock and the respond_to? expectation (an implementation
detail of how DestroyJob probes the model) with an OpenStruct that genuinely
responds to scheduled_for_deletion. Keeps only the command-facing assertions:
destroy raises and update! is called with scheduled_for_deletion: false.
Matches the repo convention of preferring OpenStruct for mock instances.

* test(snaptrade): assert connection-cleanup enqueue defers until commit

SnaptradeAccount#after_destroy enqueues SnaptradeConnectionCleanupJob, which
references the item/account by id. Before the ApplicationJob fix, Rails 8.1
enqueued it immediately inside the destroy transaction, so a worker could run
before COMMIT, see the not-yet-deleted row in its shared-authorization guard,
skip the provider call, and leak the SnapTrade connection. This regression
test destroys an account inside a transaction and asserts the job is not
enqueued until the transaction commits.
2026-06-15 21:43:08 +02:00

1.5 KiB